Period Townhouse Refurbishment, Paddington
Paddington · Renovations · Joinery

Period Townhouse Refurbishment

← All projects

A full refurbishment of a period townhouse: new staircase and landings, steel-framed glazing, bespoke joinery and bathrooms finished in stone-effect tile and brushed brass.

At the heart of the house, a winding staircase in dark timber with a slim black steel balustrade, recessed step lights and a glass-floored landing that brings light down through the house.

Downstairs, an arched steel-framed glazed door separates the reception rooms, and a full-height bar cabinet with pocket doors hides shelving, a mirrored back and an integrated wine fridge when the doors are closed.

Scope
Full refurbishment
Location
Paddington
Key features
  • Steel balustrade and timber treads
  • Glass-floored landing
  • Recessed step lights
  • Arched steel-framed glazed door
  • Pocket-door bar cabinet with wine fridge
  • Fluted walnut vanity
  • Lit shower niche
  • Brushed brass fittings
Period Townhouse Refurbishment, Paddington, photo 2
01

Joinery that disappears

The bar sits behind pocket doors that slide back into the carcass, so the dining room reads as a calm, dark wall until it's time to entertain.

Period Townhouse Refurbishment, Paddington, photo 3Period Townhouse Refurbishment, Paddington, photo 4
Period Townhouse Refurbishment, Paddington, photo 5Period Townhouse Refurbishment, Paddington, photo 6
02

The bathrooms

A cloakroom in bold, large-format marble-effect porcelain with a fluted walnut vanity, and a shower lined in textured stone-effect tile with a lit niche and brushed brass controls.

Period Townhouse Refurbishment, Paddington, photo 7
Period Townhouse Refurbishment, Paddington, photo 8Period Townhouse Refurbishment, Paddington, photo 9
Period Townhouse Refurbishment, Paddington, photo 10
Start a project

Planning something similar?

Tell us about your home and what you'd like to do. We'll arrange a visit and talk it through.

Get in touch